How to price a tiling job per square metre.
Tiling quotes go wrong in three places: the measurements, the prep nobody priced, and the tiles that run out. Measure properly, put prep on its own lines, and work out the tiles with wastage before you price.
Checked and updated 15 November 2026. General guidance, not legal or tax advice.
Measure walls and floors
Floors are length times width. Walls are the width of each tiled wall times the tiled height, less windows and doors. Measure each area separately, because a splashback, a shower enclosure and a full-height wall take different amounts of time.
| Area | How to measure |
|---|---|
| Floor | Length × width |
| Walls | Width × tiled height, less openings |
| Splashback | Width × height, or price as one item |
| Boxing and window reveals | Price by the metre or as items |
Add wastage, then work out the boxes
Cuts, breakages and pattern matching mean you need more tiles than the area. Tilers commonly allow around 10% for straight lay and more for diagonal or herringbone patterns, and more again for very large tiles where one bad cut wastes a lot. Divide the area with wastage by the coverage on the box and round up to whole boxes.
Price the prep separately
Stripping old tiles, making good, levelling floors, boarding and tanking wet areas all take time. Put each on its own line so the customer sees what they are paying for, and so your tiling rate per m² stays the same from job to job.
Large-format tiles cost more to lay
Big tiles need flatter surfaces, more adhesive, levelling clips and often two people. Keep a separate rate per m² for large-format tiling rather than squeezing it into your standard rate.
Worked example: bathroom
Example figures only, using typical starting rates: use your own.
| Line | Amount |
|---|---|
| Wall tiling: 18 m² at £50 | £900.00 |
| Floor tiling: 5 m² at £55 | £275.00 |
| Tanking (wet areas): 4 m² at £30 | £120.00 |
| Remove old tiles: 10 m² at £15 | £150.00 |
| Total (labour, tiles supplied by the customer) | £1,445.00 |
When the customer buys the tiles
Quote labour only and say so clearly: who orders, who is responsible if the tiles arrive damaged or run short, and that your guarantee covers the workmanship, not the tiles. Give them the box count with wastage so they order enough in one batch, because colour can vary between batches.
Do the sums on site
In QuoteEdge the tile calculator takes the area, your wastage and the box size, tells you how many boxes are needed, and puts the tiling on the quote at your rate per m².