Pricing per point turns a rewire from a guess into a sum: count the points, multiply by your rate, then add the parts that aren't points. Here's how to do it so nothing gets missed.

Checked and updated 15 November 2026. General guidance, not legal or tax advice.

What counts as a point

A point is anything that gets its own connection on a circuit: each socket outlet (a double socket is usually one point), each light, each switch, fused spurs, cooker outlets, extractor fans and smoke alarms. Decide how you count and stick to it, and tell the customer, so two quotes can be compared fairly.

  • Sockets (single or double)
  • Lighting points and switches
  • Fused spurs and cooker outlets
  • Extractor fans and smoke or heat alarms
  • Outside lights and sockets

What your per-point rate should cover

Your rate covers cable, back boxes, standard white accessories, chasing and clipping, and your labour for that point. Work it out from a recent job: total labour and materials divided by the number of points. Check it against your day rate: a job that takes five days should come to at least five day rates.

Premium accessories, such as metal or smart switches, are best priced as an upgrade per point, or as an optional extra the customer can choose.

What to quote separately

Keep these off the per-point rate, so the customer sees them and nothing is buried:

  • Consumer unit and any earthing or bonding upgrades
  • Testing, inspection and the Electrical Installation Certificate
  • Making good and plastering, often as a provisional sum or excluded
  • Lifting and refitting floors and carpets
  • Skip hire and waste

Worked example: a 3-bed semi

Sixty points at an example rate of £75, plus the extras quoted on their own lines. These are example figures: use your own rates.

LineAmount
60 points at £75£4,500.00
Consumer unit replacement£875.00
Testing and certificate£150.00
Making good (provisional sum)£400.00
Total£5,925.00

Building regulations

A full rewire, a new circuit or a consumer unit replacement is notifiable work under Part P in England and Wales. If you're registered with a competent person scheme, you self-certify and the customer gets the certificate; say on the quote that notification is included.

Quote it in minutes

Put your per-point rate on your QuoteEdge rate card, enter the number of points and the line works itself out. Add the consumer unit and certificate in a tap, put making good in as a provisional sum, and set stage payments for first fix, second fix and testing.

Do it in minutes

Clear, itemised quotes your customers trust.

QuoteEdge prices the job from your own rate card, puts deposits, stage payments and provisional sums on the quote, and the customer accepts on their phone.

Start your free trial
  • 7 days free
  • No card needed
  • Cancel any time
FAQ

Questions

Something else? Email tom@quoteedge.co.uk and a real person will reply.

Is a double socket one point or two?

Most electricians count a double socket as one point. Whatever you choose, say how you count on the quote so customers can compare like with like.

Should the per-point price include the consumer unit?

No. Quote the consumer unit on its own line. It's a big, clear item and customers often compare it between quotes.

How do I take payment on a rewire?

Stage payments work well: a deposit, then payments at first fix, second fix, and on testing and certification.

Get your evenings back. Send your first quote tonight.

Set up takes about two minutes. Your trade's rate card is ready and waiting, so the first quote is quick.

Start your free trial
  • 7 days free
  • No card needed
  • Cancel any time