QUOTATION

Q-0004

31 March 2026

Valid until 30 April 2026

Prepared For

Client details to be confirmed

Project

Two-Storey Rear Extension

Scope of Works

#DescriptionAmount
1Preliminaries & Setup

Site setup including scaffolding, skip hire, welfare facilities, temporary services, and all plant/tool hire. Site foreman to manage day-to-day coordination, deliveries, and health & safety throughout.

£17,290.00
2Groundwork & Excavation

Excavation to engineer's specification, spoil removal, hardcore sub-base, drainage runs, DPM, and concrete oversite. Mini digger and plate compactor hire included.

£1,456.50
3Foundations

Strip or trench-fill foundations to structural engineer's design. Rebar, concrete pour, and foundation walls built to DPC level with engineering bricks.

£2,372.50
4Structural Work

Blockwork and brickwork for internal and external walls. Cavity wall insulation, steel beams (RSJs) per engineer's spec, lintels, wall ties, and temporary propping.

£6,981.20
5Roofing

Timber rafters/trusses, breathable membrane, battens, tile/slate installation. Lead flashing to all abutments.

£3,745.80
6External Walls & Cladding

External finishes — render, cladding, or facing brickwork to match existing. Cavity closers, weep vents, air bricks, and pointing to all visible brickwork.

£1,929.80
7Windows & Doors

Supply and fit windows and external doors (double-glazed uPVC or aluminium). Cavity closers, DPC trays, plastered reveals, and all ironmongery.

£4,105.00
8First Fix - Plumbing & Heating

First fix hot/cold pipework, waste runs, soil connections, heating pipework, and underfloor heating where specified. All pipework pressure-tested.

£2,680.00
9First Fix - Electrics

First fix wiring to BS 7671 — sockets, lighting, switches, consumer unit, smoke/heat detectors, extractor fans, and specialist circuits. Certification included.

£1,271.80
10Plastering & Dry Lining

Plasterboard dry-lining and skim to all new walls and ceilings. Insulation to meet Part L — cavity, floor (PIR), roof, and acoustic between floors.

£2,090.00
11Second Fix (Plumbing, Electrics, Carpentry)

Second fix plumbing (sanitaryware, radiators, boiler commissioning), electrics (faceplates, lights, EICR cert), and carpentry (doors, skirting, architrave).

£1,944.00
12Flooring

Self-levelling screed where needed, underlay, and specified floor covering (timber, laminate, LVT, or carpet). Threshold strips and beading to perimeters.

£1,730.00
13Decoration & Finishing

Mist coat to new plaster, two coats emulsion to walls/ceilings, undercoat and gloss/satin to all woodwork. Caulking to all joints before painting.

£1,340.00
14External Works & Drainage

Drainage connections to existing system, inspection chambers, surface water drainage, and utility connections. Reinstatement of disturbed hardstanding.

£1,285.00
15Snagging & Handover

Final inspection, snagging list, defect rectification, touch-up painting, full clean, waste removal, and handover of all certificates and warranties.

£407.00
Works Subtotal£57,208.64
Contingency (10.00%)£5,720.86
Project Management£2,288.35
Net Total (ex. VAT)£65,217.85
VAT (20%)£13,043.57
Total (inc. VAT)£78,261.42

Proposed Payment Schedule

Milestone%Amount
Upon acceptance10%£7,826.14
Completion of groundworks / foundations25%£19,565.36
Completion of structure / roof25%£19,565.36
Completion of second fix25%£19,565.36
Practical completion & handover15%£11,739.21

Exclusions

The following items are not included in this quotation unless specifically stated above:

  • Party wall agreements and surveyor fees
  • Planning and Building Control application fees
  • Structural engineer calculations and reports
  • Kitchen and bathroom unit supply (fit only included unless specified)
  • Decoration to existing rooms beyond the scope of new works
  • Furniture removal or storage
  • Utility company connection charges (gas, electric, water)
  • Any works not specifically described in this quotation

Terms & Conditions

1. This quotation is valid for 30 days from the date shown above. 2. A deposit of 10% is required upon acceptance to secure the start date. 3. Stage payments will be invoiced as works progress, payable within 7 days of invoice. 4. Any variations to the agreed scope of works will be priced separately and agreed in writing before commencement. 5. All works will be carried out in accordance with current Building Regulations and relevant British Standards. 6. The contractor will maintain public liability insurance and employer's liability insurance throughout the project. 7. A practical completion inspection will be carried out jointly. Any snagging items will be rectified within 14 days. 8. Unforeseen works (e.g. structural issues, asbestos, contaminated ground) are excluded and will be quoted separately if encountered.

Acceptance

I confirm that I have read and accept the terms and conditions of this quotation and wish to proceed with the works as described above.

Signed

Date

Thank you for your enquiry